Ghana SNA Archive

Road odenance

SNA-106 Case 121/09 28 Jan 1909 – 23 Jul 1909 Case

Scanned page 13 of SNA-106: Road odenance
Scan PTDC0013.JPG · open full size

Transcription

Extract from Case 908/08. A letter from C.W.P dated 1st March, 1909(Case 523/08)

3.The actual length of trade roads in the Sekondi-Dixcove District according to the revised schedule prepared by Mr. Philbrick and sent to thr Secretary for Native Affairs to be embodied in an amending Order in- Council, is 134(1/2) miles. This schedule does not include the Sekondi to Ashieme raod 6 miles and the road from Chamah to Esipon via Inchanbang 6 miles, both of which should, I think, be included in the schedule.

(Sgd) J.T.Furly

Ag.C.W.P

Typed from the scan. Spellings follow the original and may contain mistakes.