Road odenance
Transcription
Cae B 11/10
DISTRICT COMMISSIONER'S OFFICE,
KIBBI, 26th June 1911.
Sir,
In replay to your letter Travelling No. 188/10 dated 8th inst I have the honour to inform you that I travelled over the Nsawam- Kibbi road early this month.
2.The river Dencu was in flood and risinng, the approches to the bridge was well under water and part of the bridge was submerged, and it was necessary to use the ferry canoe.
3.The raod from here to Asuboi appeared to have been once a good one, but was mostly overgrown amd littel better than a bush track. the bridges at Kweasu and both sides of Asuboi were down as well as the bridges over some of the culverts.
4.Mr. Palmer the Foreman of the Roads appeared to be making a good bit of road near Laryekroom, but I think that gravel and stone should be used in building up the road and not soft earth as I saw being used at one point, and which is likly to be washed away.
5.After leaving Asuboi the road became worse, it was much more overgrown and suitable only for simple file foot traffic. and some of the bridges were damaged.
6. Between Apedwa junction and kibbi all the bridges were in the good condition but only two miles out of about ten had been recently cleared. I found four boys clearing this part of the road.
7. I venture to suggest that gangs of roads cleabers be sent to the differant portion of the road and clear away the overgrowth and fallen trees, and that suitable and more permanent bridges be erected over the streams. If this was done the road would be suitable for cask rolling cycling, and __transport, and as the cocoa season
THE AG: COMMISSIONER WETERN PROVINCE
AKUSE
Typed from the scan. Spellings follow the original and may contain mistakes.