29th May 1910.

Sir,

I beg to say that I wrote under dated 12/10/09 explaning to the Director the steps I had taken in this matter and I wrote again (March 1910) pointing out that a sort of dead-lock had arisen.
I propose now to give a remuse of the matter, commencing from the date Konor Mate Kole's offer to build a bridge for £90. (Mate Kole's letter to D.C. Akuse 29/7/09).
In Aug: 1909 I was instructed (verbally) by the D.P.W. to see Mate Kole and get him to state definitely what sort of bride he proposed to erect.
In Sep 09 in company with the Assst. Insp. of works,Akuse I had an interview with Konor Mate Kole and on leaving him he promised to furnish me with a rough plan or a written sepecification.
Up to the time of receiving the D.P.W’ s reminder Ak.8/09 I had not heard from Mate Kole so I prepared a drawing of a masonry and timber bridge with piers fairly close to-gether obiate to the necessity for very heavy timber bearers, and forwarded to the D.P.W stating that in my opinion this was the cheapest bridge that would suit the place.
As the then Ag: D.P.W did not like a central pier as shown in my drawing, the necessary alteration was made by D.E.H. Seaton Wade, and his plan was sent to me under date 16/2/10 to lay before Konor Mate Kole with the idea of getting him to give a give for erecting same.
On 28th Feb. 1910. Mate “Kole wrote offering to erect the Bridge for £90 providing the Col. Govrnt pay more if