SNA-49 Case 5158/99

Scanned page 34 of SNA-49: Untitled case file
Scan PTDC0032.JPG · open full size

Transcription

Hon A.C.S.

I suspected the Bridge they are built of stones and cement ridht up from the bed of the stream to abut 3 ft above the surcface, flored with thick plauko and boarded, a step on either side with earlier each bridge is tarred - they are superior to the ordinary bridge and likly to last one year: I beg to suggest that at least £25 be given to king akrobells, considering that king mate kole had £ 10 far an inferior bridge which cost him a likly over £5.10.0 king and Akrobellor statement of cost is attached

(signature)

16.1.00

H.C. The Acting of Governor

Submitted . D.C. murphy suggest from £ 5 to £ 7 as a ___and the D.P.W., to the Konor the bridge I has seen the Murphy on the subject does not advoate a large sum

(signature)

27/10.

B.U. on return of Mr. murphy

(signature) 27/10.

B.U. 7.11.00

B.U. 17.11.00