Ghana SNA Archive

Untitled case file

SNA-49 Case 5158/99

Scanned page 103 of SNA-49: Untitled case file
Scan PTDC0104.JPG · open full size

Transcription

( 15 )

The main 3 beams to be of Otla
which is said to be much more
durable and stronger than Odoom - the
bridge to be six feet wide. He says
that he should require small advance
as the work went on -

The D.P.W.,

I should like to uh have your opinion upon this
tender before submitting it to the Acting Governor.

[initials]
21. 7. 96

Acg Col Sec
These bridges have been designed
according to information obtained by
Mr Jones on the spot who is better
qualified & to locate the position to judge what kind of
bridges are required than Chief Odonkor
[initials]
31. 7. 96

The Acting Governor,

It seems to me that it will be far better for
this work to be undertaken as soon as possible and I am
inclined to recommend that Chief Odonkor's offer for the
construction of the bridge over the Okoi for £45 should
be accepted. The estimate framed by Mr.Jones amounts to
£304.5.8 and Chief Odonkor is perfectly capable of
judging what the local requirements are and if
he can build a bridge which will suit local requirements
for

Typed from the scan. Spellings follow the original and may contain mistakes.