Ghana SNA Archive

Untitled case file

SNA-49 Case 5158/99

Scanned page 181 of SNA-49: Untitled case file
Scan PTDC0183.JPG · open full size

Transcription

113

The D. C. Volta River District

I am afraid that under the
circumstances to place a bridge
over the Okoi, would be rather
an expensive matter. Have you
any means of estimating what
the cost would be if it were done
by local labour? You would want
two strong baulks of timber on
either bank of the river and two
more on either side about 20 feet
further away. Then of course there
would be strong ^[for the platform part]^ boarding and hand
rails.

FMH
15. 1. 91.

The Honourable,
The Col: Secretary,

I do not think that it
will be expensive in the end Sir.
Although, I am sorry, I have not
the means of estimating its cost.
by local labour, yet, I doubt
whether it will be more than £25
to £30. On a next visit of a
Foreman of Works to this place he
might be ordered to inspect the
place and report.

[signature]
28/2/91

Typed from the scan. Spellings follow the original and may contain mistakes.