Ghana SNA Archive

Untitled case file

SNA-49 Case 5158/99

Scanned page 195 of SNA-49: Untitled case file
Scan PTDC0197.JPG · open full size

Transcription

(Public Works Form, No. 5.)
S.S.C.-(1,000)-11/1/32.

Carried forward £ 238 10 5
1/2 do 3" -do- 5 -
1/2 do 4" Nails 8 -
1/2 Cwt 6" Spikes 16 -
Iron Bolts for boxes 15 -
Labour making -do- 2 - -
500 -do- Odoom boards for concrete boxes &c 5 - -
Odoom including labour } 6 17 6
320 Lin. feet Handrail 4 x 3 plain rough
Labour laying -do- 3 16 8
250 pieces Planking to floor Odoom in 7' 0" x 6 x 3 laid with open joints } 3/- 34 10 -
Labour fixing -do- 3 - -
43 1/2 -do- -do- 14 x 8" 4/- 13 1 -
83 1/2 Cube feet Girders. Odoom 12 x 6 and 10" x 6" 5/- 20 17 6
56 1/2 -do- Concrete in piers 40/- 113 - -
223 1/2 -do- Digging and filling to banks 2/- 22 7 -
20 1/2 Cube yards Excavation to piers 1/6 1 10 9
Shelter Hut for Foreman and tools } 5 - -
Cutting down rush & clearing bush rest of present road } 5 - -

SUMMARY.
Rate. £ s. d.

M.P. No. ______
ESTIMATE No. ______
ESTIMATE of the expense necessary to be incurred for a Bridge over the Ohoi
River on the Ahuse - Tong Road (at A)
chargeable to Vote for ______

(127)

Typed from the scan. Spellings follow the original and may contain mistakes.