Road odenance

SNA-106 Case 121/09 28 Jan 1909 – 23 Jul 1909

Scanned page 112 of SNA-106: Road odenance
Scan PTDC0113.JPG · open full size

Transcription

structed and ditched all the streams have been bridged, leaving 22 miles to be done. This is the most important road in the district, for it is the main road to Kwahu. Road No.2 Boonso to Kibbi from the junction of the Kwahu main road to the headquarters of the district. This was well constructed years ago by Mr. Pritchard and the Goldfields of Eastern Akim, it has been well cleared and all the streams bridged, and Boontas toolasmare available will be re-constructed. One mile has been already done, 5. Road No.3 Kibbi to Kukurantumi. This road has been cleaned and improved, but there are some big streams to bridge, and iit needs re-construction. When tools are available this work will be carried out. 6. Road No.4 Abetife to Praeso. This is the main road from Kwahu to Coomassie, and 8 miles has been reconstructed and most of the streams bridged, the remainder of the road is now being reconstructed.7. Road No.5 Abetife to Mankrond. This is a long road with few villages on it, but is of first imporatance as it connects the big of Kwahu with Afram River and there is a lot of traffic along it; the trade is chiefly with Akuse. The Chiefs of big towns have consented to assist in constructing it, but I could not start work on it for lack of the necessary tools; but all streams have been bridged between Abetife and Tafo and road well cleared between these towns. 8. Road No.6 Begoro and Akuse via Dawa and oduase. If this Road is brought under the ordinance it should be from Begoro to Odumase a distance of about 42 miles. Ido not know what work has been done on this road as I have not visited Begoro this year, but will inspect and report on it when I do. 9.Road No7 Kibbi to Kurakru River, this is the Kibbi Nswam road, now in the hands of the P.W.D. The work however

Typed from the scan. Spellings follow the original and may contain mistakes.