Ghana SNA Archive

Untitled case file

SNA-75 Case 2980

Scanned page 29 of SNA-75: Untitled case file
Scan PTDC0029.JPG · open full size

Transcription

Extract from a letter from the Acting Commissioner Central Province No.P.8/07 dated 21st November, 1907.
(Case 1543/07)



4. Saltpond — Nsuaem Road.
(a) The work necessary to get this road fit for motor traffic should be pushed forward with all possible speed.
(b) I do notthink there are any gradients as far as AJurn.ko Which will require altering for motor traffic but thee ar I am afraid ratier a large number of bridges and my remarks in paragraphs two and 3 (a) apply to this
(c) This road will require beginning quite
from the beach.
(d) By getting a collecting centre at Ajmako a large new area f or oil and kernels,1be tapped which at present is hardly worked at all.
(e) North of A.jdma.ko there are some gradients inxpo3sible I think for motors which would require altering.
(f) North of Essikuma the road is only an eight foot road and not made f or vehicular traffic; I think partly on my own advise to save expense; this portion would be more expensive to put in order, but the cocoa traffic alone I think would warrant this but even reaching Ajumako or Essikuma should increase trade consider ably.



x x x
(Sd) H. C. W. Grimehaw

Acting Provincial Commr.

Typed from the scan. Spellings follow the original and may contain mistakes.