Ghana SNA Archive

Untitled case file

SNA-49 Case 5158/99

Scanned page 134 of SNA-49: Untitled case file
Scan PTDC0135.JPG · open full size

Transcription

91
MINUTE PAPER No. 3510 (Continued.)
92

Letter from the Acting Colonial Surveyor dated
the 24th February attached.
SS.
28.2.93

B.U. 31st March
FMH.

Letter from the D.C. Akuse dated the 1st
March attached.
SS.
4.3.93

B.U. 31st March
FMH.
6.3.93

Write to the Dist. Comr. Volta River District,
as follows:-
4.4.93.

Sir,
With reference to previous correspondence
respecting the construction of bridges over of the / some
drains on the main road between Kpong &
Odumasi, I have the honour, by the Govr's.
direction, to enquire what progress has been
made on this work by Chief Odonkor now
that the tools he required and the amount
of £6 asked for have been supplied to him?

I have &c.
WR for C.S.
1.4.93

B.U. 24 April
FMH

written
End.
4.4.93.

Typed from the scan. Spellings follow the original and may contain mistakes.