Ghana SNA Archive

Untitled case file

SNA-49 Case 5158/99

Scanned page 135 of SNA-49: Untitled case file
Scan PTDC0136.JPG · open full size

Transcription

Letter from the D. Commr Akuse dated the
9th April attached.
[Signature]
13. 4. 93

B.U. 10th May
FMSH

Letter from the D. Comm Akuse dated the
22nd April attached.
[Signature]
24. 4. 93

The Governor,
I think Your Excellency would like to see
that the road between Kpong and Odumasi
upon which Chief Odonkor has been engaged
has now been completed with the exception of
the bridge across the River Ogyado which it
^was^
is decided to leave over until a competent
person had made an examination and
reported upon the matter.
FMSH.
25. 4. 93.

CS. Seen. Thanks. I think the
rainfall has been less to the
Eastward than at Accra, otherwise
I fancy O'Donkor's bridge would not
not have withstood the rush of flood
water there would have been.
WBG. 26.
4. 93 A.

Typed from the scan. Spellings follow the original and may contain mistakes.